|
||
date: 20/04/2009 Dolphin Shopping Centre Toilet Refurbishment. Batchelor Electrical has completed a small works project with Interserve Retail and Interiors to refurbish the communal toilet area within the Dolphin Shopping Centre, Poole. The electrical scope of works included the installation of the latest generation of Xlerator energy efficient hand dryers. The Xlerator dryers use up to 80% less energy than traditional hand dryers by forcing air much faster reducing dry times from 30-40 seconds down to 10-15 seconds.
|
|
|
HOME • CLIENTELE • TESTIMONIALS • HEALTH AND SAFETY • ENVIRONMENTAL • OUR BELIEFS • NICEIC • PRIVACY POLICY |
||